The actual plan time in minutes is calculated as follows:
If the "quantity per" factor is 0, the assembly quantity is not considered.
Capacity Planning ( ( (Machine time + Labor time + Mach+labor time) if "per assembly" > 0 then (* (Order Quantity + Scrap) : (per assembly)) : Utility factor * Work steps * (1 + scrap factor : 100) ) + Set-up time ) * Time factor (1 for minute, 60 for hours) * 100/Efficiency rate in %
Precalculation, batch calculation ( ( (Machine time + Labor time + Mach+labor time) if "per assembly" > 0 then (* Lot size : (per assembly)) : Utility factor * Work steps * (1 + scrap factor : 100) ) + Setup for calculation ) * Time factor (1 for minute, 60 for hour)
The lot size itself depends on a) calculated quantity b) defined reject factor c) stored calculation lot size.
Final costing ( ( (Machine time + Labor time + Mach+labor time) if "per assembly" > 0 then (* (Order Quantity + Scrap) : (per assembly)) : Utility factor * * (1 + scrap factor : 100) ) + Setup for calculation ) * Time factor (1 for minute, 60 for hours)
|