help-ablauf Item breakdown

Top 

The setting for item breakdown (scheduling ID) are used to define how the item will be handled in scheduling, precalculation, production and costing analysis. The scheduling ID affects only the breakdown. MRP computes order related items and store related assemblies in the same way.

 

 

The following types are available:

 

Buy

No breakdown

Possibly stored bills of materials and routings are not considered

Provision parts

The bill of materials contains provision parts included in goods receipt. See Purchase Order

 

Produce

Assembly

This is an assembly that is manufactured for storage. Sub-assemblies are produced separately.

By Order

This is an assembly that is produced by order, i.e. the sub-assemblies are also produced together with the main assembly.

Phantom Assembly Group

This is a phantom assembly, i.e. its routing and bill of material are part of the assembly used.

If the item has the type "Pseudo item", then it behaves as an item with disposition "Phantom assembly".

 

Set Item

The bill of material is not broken down in production but already in the order.

Template

Same as SET item

No breakdown

Bill of material and routing are not considered

 

 

back to item master


Help URL: https://help.beascloud.com/beas202404/index.html?artikelauflosung.htm